SPC, LVT, WPC and PVC, floors and panels.The publication · Floors, panels & surfaces

PSI / Before dispatch

Before the container leaves.

Check the order against an agreed brief before it leaves the factory. Define the scope, record what was inspected and put the findings in context.

01

The reference

Agree the purchase order, product specification, approved sample, packing requirements and inspection criteria.

02

The checks

Select the checks that belong in the assignment: visible workmanship, dimensions, quantity, identification, packing and any agreed on-site functional checks.

03

The record

Document the inspected sample, observations, photographs, deviations and limitations in an assignment-specific report.

04

The decision

Review the findings against agreed criteria. Corrective action, reinspection and shipment release remain explicit decisions.

A defined inspection, not a blanket guarantee.

Sampling does not mean every item is examined. Laboratory performance testing, certification, loading supervision and a full factory audit are separate scopes. Our report must say what was checked, when and against which reference.

Read the inspection field guide

Sourcing and consulting services are provided by Fake Flooring. Availability, access to the goods, responsibilities and relevant supplier relationships are agreed before the assignment.