Field guide / Pre-shipment inspection
The last check starts before the last day.
A practical brief for pre-shipment inspection: what to agree, what to make available and how to read the resulting report.

Agree the reference and inspection criteria in advance.
Sampling describes selected goods, not every item.
Separate the findings from the shipment-release decision.
Write the reference before booking the visit
An inspection needs something specific to check against. SGS describes its service in relation to the reference sample, confirmed specification, purchase order and packing instruction. Gather those references into a controlled brief instead of relying on an inspector to reconstruct the order from scattered messages.
For a flooring or panel order, our suggested document list starts with the product identity, approved appearance reference, dimensions, construction, order quantities and packing requirements. Identify the latest revision and the person who can resolve an unclear instruction.
Make the goods and the scope available
Intertek places final random inspection after production, when goods are ready and packed for shipment. Confirm the readiness and accessibility needed for the assignment before arranging a date. A visit cannot answer questions about goods that are not available to inspect.
Agree the lot definition, selected checks, sampling approach and criteria in advance. Dimensions, visible workmanship, identification and packing may belong in an on-site scope. Specialist laboratory testing or loading supervision may require a different assignment.
Read what the report actually covers
SGS describes sampling and reporting against a defined inspection plan. A sampled inspection is not a statement that every item has been examined. The report should make the inspected lot, reference, selected sample, findings and limitations clear enough to review.
| Report element | The question it should answer |
|---|---|
| Reference | Which approved order and specification were used? |
| Scope | What was checked and what was outside the assignment? |
| Findings | What was observed, measured or documented? |
| Limitations | Which requested checks could not be completed? |
| Follow-up | What needs correction, clarification or reinspection? |
Keep the release decision explicit
A finding, a corrective action and permission to ship are separate decisions. Agree who receives the report and who is responsible for deciding what happens next. Where a result is unclear, identify the specific question rather than converting uncertainty into a blanket pass.
Our PSI service is presented on that basis: a defined assignment, separately scoped and priced. It is not a substitute for product certification, an ongoing factory audit or a guarantee about every future shipment. Inspection enquiries are not connected in this development edition.
Sources & further reading
Authorship, affiliations & disclosure
AI-assisted, source-based editorial preparation. The practical checklists are proposed buying workflows, not an independent product test, inspection report or manufacturer endorsement. Commercial services are separately identified.
Corrections & editorial informationContinue exploring.
The reading roomRead the certificate, not the badge.
The company, product, site and dates behind a flooring certificate matter more than the logo on a supplier presentation.
Read the featureA panel is more than its surface.
PVC wall panels begin with a sheet. A successful specification includes the substrate, joints, fixing method and intended application.
Read the featureA similar surface is not the same design.
From an inspiring image to a supplier film reference: the checks between a visual match and something you can actually order.
Read the feature

