Record what must remain the same
Use the approved sample, specification revision, test requirements and packaging or installation interfaces where they affect the programme. Identify which variations you can accept.
Alternative suppliers / Vietnam SPC
Already buying from a factory in Vietnam? Build an alternative around the approved product and the issue you need to solve, rather than starting again with a list of names.
A practical starting point
A second factory’s similar catalogue item is not automatically a replacement for the product you buy today. Keep the construction, surface, dimensions, pad grade, locking system and sample revision visible. Define whether the alternative is a backup, a new programme or a full transfer. That changes which differences are acceptable and what must be verified before a trial order.
Public source snapshot reviewed 2026-10-15. Open a profile for source dates and limitations.
| Manufacturer | Production area | Published product scope |
|---|---|---|
| Phu Tho | SPC flooring; broader AMY material portfolio | |
| Hai Phong | SPC flooring, wall panels, ceilings and other building materials | |
| Quang Ninh | SPC flooring | |
| Ninh Binh | SPC flooring and PVC wall panels | |
| Quang Ninh | SPC with and without pad is named in the Vietnam Assure document; collection and construction availability to confirm. | |
| Hai Phong | SPC, WPC and hybrid flooring at group level | |
| Hai Phong | SPC flooring; Green Diamond and Matfloor manufacturer brands | |
| Thai Nguyen | SPC and LVT in the historical Vietnam certificate; broader group vinyl portfolio | |
| Hai Phong | Rigid-core SPC flooring and accessories | |
| Hanoi | SPC flooring | |
| Bac Ninh | SPC / LVT / WPC flooring | |
| Thai Nguyen | Rigid SPC vinyl, including a pad option, in historical documentation | |
| Ninh Binh | SPC click flooring, gluedown LVT and PVC marble sheets |
From a name to a qualified supplier
Use the approved sample, specification revision, test requirements and packaging or installation interfaces where they affect the programme. Identify which variations you can accept.
Separate concerns about delivery, communication, construction, documents or commercial terms. Ask each candidate to demonstrate the capability relevant to that concern.
Review the sample and current supporting documents, confirm the contracting site and agree a trial and inspection brief. A consultation can help prepare that process; it does not certify an interchangeable product.
That must be established through the specification, reference identity, sample and relevant evidence. Similar dimensions or an oak visual do not prove identical construction, finish, locking compatibility or performance.
Bring the current product sheet, the approved sample references, the reason for the change and the questions that remain open. Arrange any confidential document exchange directly with the team; this site does not accept uploads.
Google Analytics sends cookieless measurements. May we also use analytics cookies and masked Clarity recordings? These stay off until you allow them. Change your choice at any time. Privacy details