Origin & rules / Environmental declarations
Environmental product declarations for SPC: check the board and the plant
Under EPD International rules an EPD is normally valid five years. Check unit, thickness, modules, plant and PCR before an SPC EPD goes in a tender.
Short answer
An SPC EPD is usable only if it describes the board you are buying, from the plant that makes it. Check the declared unit and thickness, the modules declared, the manufacturing sites listed, the owner, the validity dates and the PCR. Then look it up in the programme operator’s register. Two EPDs compare only on the same PCR, unit, modules and impact method.
Under EPD International’s construction PCR 2019:14, an EPD is normally valid for five years from its version date and must be updated if its GWP results rise by 10% or more.
BREEAM UK New Construction 2018 treats each thickness a specifier can choose as a separate product for its EPD credit; decor colours and patterns stay within one product.
LEED v4.1 BD+C counts a product-specific, externally verified Type III EPD as 1.5 products towards its 20-product EPD option.
An environmental product declaration is a verified life-cycle report for one defined product, made at named sites, calculated to one set of rules. Whether a factory has an EPD matters less than whether that EPD describes your board. How certificates in general are checked is in our guide to reading the certificate, not the badge; this guide covers only the EPD.
What should you check first on an SPC flooring EPD?
Start with six fields on the first pages: owner, product and thickness, declared unit, modules, manufacturing sites and validity dates, plus the PCR and programme operator. If any of them does not match your order, the results table is about a different product, however good the numbers look.
The table lists where each field sits and what a mismatch means. The rules quoted come from EPD International’s construction PCR 2019:14 and its General Programme Instructions; other operators publish their own instructions.
| Field | What you want to see | Mismatch that matters |
|---|---|---|
| Owner | The company on your contract, or the manufacturer behind it | A group company, or a trader with no link to your plant |
| Product | SPC, the construction and thickness on your specification | LVT, WPC, or a thickness you are not buying |
| Declared unit | 1 m² of a stated build, or 1 kg with a conversion factor | A unit you cannot convert to your board |
| Modules | A1-A3 at least; C1-C4 and D unless excluded under the four PCR criteria | A1-A3 only, with no stated reason for leaving out C |
| Sites | The plant that will make your order | A plant in another country |
| Validity | Version date and valid-until date covering your tender date | Expired, or not found in the operator’s register |
| PCR and operator | PCR named with version; registration number from the operator | No PCR, or a number issued by the certification body instead |
Which declared unit and thickness does the EPD use?
Most results are per declared unit, and that unit fixes what the numbers describe. PCR 2019:14 requires a declared unit unless a complementary PCR allows a functional unit, and where mass is not the unit the EPD must give a conversion factor to mass. Read the unit line before any result.
For SPC, a unit of “1 m² of floor covering” means nothing until you know the build: total thickness, wear layer, attached underlay and the board mass per m². A heavier core or a thicker board raises results per m². If the EPD covers a range, look for how it treats thickness. Some declare one reference product; some give results per thickness; some declare per kg and leave the conversion to you.
BREEAM’s rules show why this matters in a tender. For the BREEAM UK New Construction 2018 EPD credit (Mat 02), knowledge base entry KBCN1142 treats different thicknesses the specifier can choose between as different products. Decor colours and patterns are an exception and stay within one product, unless the manufacturer lists them as separate products. An EPD for a 5 mm board does not cover the 6.5 mm board in the same collection. Write the declared build into the written product specification so the EPD and the order describe the same board.
Underlay is a separate trap. An SPC board with a factory-attached pad is declared as that combination, and its results cannot be set against a board without one.
Which modules does the EPD declare?
Under EN 15804+A2 an EPD declares the product stage A1-A3, the end-of-life modules C1-C4 and module D, unless the exclusion conditions are all met; PCR 2019:14 applies three conditions from the standard and adds a fourth. Transport to site (A4) and installation (A5) are optional for goods in a cradle-to-gate EPD with options. Check which modules carry results before you compare totals.
The table sets out the modules a buyer meets on a flooring EPD, from the PCR’s life-cycle table. Status is for a type b EPD (cradle to gate with options, C1-C4 and D). A type a EPD declares no A4, A5 or B modules; a type c (cradle to grave) declares all of them.
| Module | What it covers | Status for goods under PCR 2019:14 |
|---|---|---|
| A1-A3 | Raw material supply, transport to the plant, manufacturing | Mandatory, declared in aggregated form |
| A4 | Transport to the building site | Optional |
| A5 | Installation, including installation waste | Optional |
| B1-B7 | Use, maintenance, repair, replacement | Optional for a type b EPD |
| C1-C4 | Deconstruction, transport, waste processing, disposal | Mandatory unless all four exclusion criteria are met |
| D | Reuse, recovery and recycling potential beyond the system boundary | Mandatory with C; reported separately |
To leave out C and D, the PCR requires that the product is physically integrated with other products so it cannot be separated at end of life, is no longer identifiable after a transformation, contains no biogenic carbon, and that the EPD is not meant for business-to-consumer use. A floating click floor can be lifted, so we would question an SPC EPD that stops at A1-A3 and ask how the exclusion was justified.
A4 covers the sea leg from an Asian plant to a European site, and it is optional. If one EPD declares A4 by sea and the other leaves it out, adding up all declared modules compares two different scopes.
Does the EPD cover your plant and your product?
An EPD covers the products and the manufacturing sites it lists, and nothing else. If several sites are averaged, PCR 2019:14 requires the sites to be listed and the difference in A1-A3 GWP-GHG between the reported result and the underlying sites to be stated: the percentage if above 10%, or “<10%” if below.
Two plants show how often scope and order drift apart. The EPD International register lists an LVT declaration owned by Vietnam Hengli, EPD-IES-0031364:002, version 15 May 2026, valid to 14 May 2031. As the Hengli factory page notes (reviewed October 2026), this declaration is LVT-specific and must not be applied to the company’s SPC or WPC.
For the Thai plant of VYTEC Floor, the current EPD covers manufacturing in China (reviewed 31 October 2026). A buyer ordering from the Thai site would be relying on a declaration for another country’s plant.
Two more cases need care. A trader may publish an EPD under its own name, based on the manufacturer’s EPD or data; the PCR then adds the trader’s transport to its warehouse or market border and its own packaging to module A3, and the warehouse location must be declared. A sector EPD declares an average or worst-case result across several companies, and it says nothing specific about yours.
For a private-label range, the cover page names the declared product and the EPD owner, who has sole responsibility for the declaration, and the EPD must identify the product unambiguously. If your brand name is not the declared product name, the EPD does not on its face identify your goods; ask the owner how your range maps to the declared product, or use the trader route.
Is the EPD valid, verified and published?
Under PCR 2019:14 an EPD is normally valid for five years from its version date, or until deregistered. It must be updated and re-verified if GWP results rise by 10% or more, or if product information changes substantially, for example a change of manufacturing site. A depublished EPD is not valid, even if its stated validity has not passed.
Look the EPD up in the programme operator’s own register by its registration number. EPD International issues numbers in the form EPD-IES-XXXXXXX:XXX and its instructions bar a certification body’s number from being presented as the registration number. The General Programme Instructions (version 5.1.0, November 2026) also state that an expired EPD left online for record keeping must not be used in any market application, public procurement included.
Verification is independent: under the same instructions, the LCA report and EPD are checked by an accredited certification body or an approved individual verifier, through individual verification, EPD process certification or a pre-verified tool. The EPD names its verifier. Check the owner name against the company that will invoice you, which is part of checking which legal company runs the plant.
Timing matters for BREEAM. Knowledge base entry KBCN0798 says EPDs that had expired or were pending verification when the product was specified cannot contribute to credits; they need not still be valid at later submission stages.
How do you compare two SPC EPDs fairly?
Under the comparability statement PCR 2019:14 puts in every EPD, two EPDs compare only with the same PCR or fully aligned PCRs, identical declared or functional units, identical life-cycle scope, identical impact methods and characterisation factors, and both valid at the time. Converting units fixes only one of those conditions. If the rest differ, report both as they are and do not rank them.
The diagram shows the order we check in. Each gate either passes or sends a question back to the factory.
Worked example: two EPDs for one tender
Illustrative only; no figure below comes from a real EPD. A UK distributor bids an SPC floor for a school project assessed under BREEAM. The specification is a 5.5 mm board with a 0.55 mm wear layer and no attached pad. Two factories send EPDs.
| Item (illustrative) | Factory A EPD | Factory B EPD |
|---|---|---|
| Declared unit | 1 m², 5.0 mm board, 9.6 kg/m² | 1 kg, conversion 12.4 kg/m² for a 6.5 mm board with 1 mm attached pad |
| Modules with results | A1-A3, C1-C4, D | A1-A3, A4, C1-C4, D |
| A1-A3 GWP-GHG | 9.0 kg CO2e per m² | 0.85 kg CO2e per kg |
| Per kg, converted | 0.94 kg CO2e | 0.85 kg CO2e |
| Per m², converted | 9.0 kg CO2e | 10.5 kg CO2e |
| PCR | PCR 2019:14, version 2 | Another operator’s PCR |
Per kg, B looks lower. Per m², A does. Neither EPD describes the 5.5 mm board in the bid, B includes a pad, and the PCRs differ, so the comparability conditions fail before the numbers do. Under KBCN1142, neither thickness is the product being specified.
The distributor writes to both factories asking whether a 5.5 mm board without pad is declared, or can be added in an update, and by when. Factory A confirms that its next version will add 5.5 mm. The bid lists both EPDs as received, states the scope gap and does not claim either board is lower-carbon.
Where do tenders and green building schemes ask for EPDs?
Green building schemes such as LEED and BREEAM reward products with EPDs, each under its own rules, so the same EPD can count in one and not in another. In the EU, the 2024 Construction Products Regulation adds declared environmental characteristics, but the Commission’s page gives no flooring date yet.
LEED v4.1 BD+C has an Environmental Product Declarations credit. Option 1 asks for at least 20 different permanently installed products from at least five manufacturers, 10 products from three manufacturers for Core and Shell and warehouses. EPDs must conform to ISO 14025 and EN 15804 or ISO 21930, with at least a cradle-to-gate scope. A product-specific Type III EPD with external verification and critical review counts as 1.5 products; an industry-wide EPD counts as one, provided the manufacturer is recognised as a participant by the programme operator. Check which LEED version the project is registered under before you rely on these counts.
BREEAM UK New Construction 2018 rewards specifying products with EPDs under Mat 02, with the product, thickness and validity rules covered above. Projects list EPDs in the EPD schedule of BRE’s Mat 01/02 results submission tool, so your EPD counts only if the project team has the right file and registration number. These knowledge base entries are for the 2018 scheme; if the project is registered under a later BREEAM version, ask the assessor which rules apply before you send an EPD.
Regulation (EU) 2024/3110 entered into force on 7 January 2025 and its main part has applied since 8 January 2026, according to the European Commission. The Commission says manufacturers must now declare predetermined environmental characteristics based on life-cycle assessment. The page does not say from when this applies to a given product family, and as of November 2026 it sets no date for floor coverings, so we make no claim about one.
For floor coverings, the CEN product category rules are EN 16810:2017, covering resilient, textile and laminate floor coverings and modular floating panels. A revision, circulated as draft prEN 16810 in 2024, extends the title to modular mechanical locked floor coverings and underlays. EPD International applies EN 16810:2017 through its c-PCR 2019:14-c-PCR-004, used together with PCR 2019:14; the Hengli LVT declaration cites it. Ask which PCR an SPC EPD follows; it decides what can be compared with what.
What an EPD cannot prove
- It does not prove the board in your container matches the declared product. That is a specification and inspection question.
- It does not prove country of origin. A site listed in an EPD is not origin evidence; that file is built separately, as in our origin check for SPC made in Vietnam.
- It does not trace PVC resin to its source. That material trail is a separate file, set out in the UFLPA guide for PVC flooring.
- It is not an indoor-emissions certificate, a slip test or a fire classification, and it does not certify that a product is “green”. An EPD reports results; it sets no threshold to pass.
Our view
We would treat an SPC EPD as a document for one board from one plant and check scope before results. Ask for it with the quotation and write the declared thickness and plant into the purchase order. If the order changes either, the EPD needs to change too.
For tenders, we would submit only EPDs that pass every scope check and state gaps openly. A missing EPD can be explained; a mismatched one found by an assessor costs credibility on the next bid. If no factory on the shortlist has a declaration for your build, agree ownership and scope before anyone commissions one.
Our buyer-side purchasing office can request EPDs from shortlisted plants and check scope, sites and register status against your specification; the tender decision stays with you. Related guides on duties, origin and import rules are in the origin and rules guides.
Common mistakes with SPC EPDs
Most problems come from using a real, valid EPD for something it does not describe. The table lists the ones we would check for on every submission.
| Mistake | What it costs | How to avoid it |
|---|---|---|
| Using the factory’s LVT or WPC EPD for SPC | The declaration describes a different product | Match product type and construction on the cover page |
| Ignoring thickness in a range EPD | Under BREEAM Mat 02, a different product | Confirm the thickness you specify is declared |
| Comparing totals across different module sets | One result includes transport or end of life, the other does not | Compare A1-A3 first, then each module alone |
| Converting units and calling the EPDs comparable | Different PCRs or methods still differ | Apply the full comparability statement |
| Accepting a PDF without checking the register | Expired or depublished EPD in a tender | Look up the registration number on the day you submit |
| Order moved to an unlisted plant | EPD no longer describes the goods | Plant address in the PO; moves only with your approval |
Questions buyers ask
Can I compare a new EPD with an older one made under EN 15804+A1?
Not on climate results. PCR 2019:14 version 2 says its GWP-GHG results shall not be compared with GWP-GHG results in EPDs based on earlier versions of the PCR or on PCR 2012:01 under EN 15804+A1. Ask the factory whether an updated declaration is planned.
What happens if the factory moves my order to another plant during the EPD’s validity?
If that plant is not listed in the EPD, the declaration no longer describes your goods. Under PCR 2019:14 a change of manufacturing site counts as a substantial change that requires an update. Put the plant address in the purchase order and make any move subject to your written approval.
Can I ask the factory to commission an EPD for my private-label range?
Yes. Agree in advance who owns it, which products, thicknesses and plants it covers, which programme operator publishes it and who pays for updates. If you would rather hold the EPD in your own name, the trader route described above applies.
Is an EPD on the factory’s website enough evidence for a tender?
Use the copy from the programme operator’s register, checked on the day you submit, and keep a dated download. A PDF from a website may be an older version, and a depublished or expired EPD can still be circulating as a file.
Does an industry or sector EPD help?
Sometimes, if the scheme accepts it. It cannot show that your factory performs better than the sector average, and LEED v4.1 counts an industry-wide EPD as one product where an externally verified product-specific EPD counts as 1.5.
Sources & further reading
- EPD International: PCR 2019:14 Construction products, version 2.0.1 (5 June 2025, valid until 7 April 2030)
- EPD International: General Programme Instructions, version 5.1.0 (10 November 2026)
- USGBC: LEED v4.1 Building Design and Construction rating system, MR credit Environmental Product Declarations (current file linked from build.usgbc.org/bdc41, read November 2026)
- BRE: BREEAM UK New Construction 2018, Mat 02 knowledge base entries KBCN1142, KBCN0798 (read November 2026)
- EPD International: c-PCR 2019:14-c-PCR-004 Resilient, textile and laminate floor coverings (EN 16810), version 1.0.0 (read November 2026)
- European Commission: Construction Products Regulation 2024 revision (read November 2026)
Authorship, affiliations & disclosure
Prepared from the primary sources listed, read on 11 November 2026, and from factory documents with their review dates. The worked example uses illustrative figures, not results from any real EPD. Scheme rules change; confirm the current requirement with the project’s assessor before you rely on a declaration.
Corrections & editorial informationContinue exploring.
All guides in Origin & rulesHow to check the origin of SPC flooring made in Vietnam
Check 4 evidence trails before an SPC order: factory, materials, production and shipment. A buyer workflow grounded in US customs rules.
Read the guideUFLPA and PVC flooring: trace the materials behind the order
Build a PVC traceability file for a US flooring order using CBP guidance updated in 2026. Separate final-plant audits from upstream evidence.
Read the guideUS tariffs on SPC flooring from Vietnam in 2026: what applies today
As of 26 October 2026: the HTS 3918.10 rate, the 12.5% Section 301 duty on Vietnam, the China comparison, AD/CVD, UFLPA and EAPA, with a worked example.
Read the guide

