SPC, LVT, WPC and PVC, floors and panels.Purchasing office · Floors, panels & surfaces
More in Specs & quotes

Specs & quotes / FOB price

SPC flooring FOB price in Vietnam: what the number is made of

What sits inside an SPC FOB price from a Vietnamese factory, line by line, and which written terms move it. Built on Incoterms 2020.

Short answer

An SPC FOB price from a Vietnamese factory adds up the board (core, wear layer, decor film, coating, pad, click licence), the packing, the factory’s costs of clearing the goods and getting them on board at the named port, and its margin. That total is priced for one quantity per decor, one payment term, one currency and one validity date. Change any of those and the price changes.

01

Ask for FOB at a named Vietnamese port with the origin port and export charges written as lines; under Incoterms 2020 FOB they are the seller’s until the goods are on board.

02

Name the click system and its licensor in the request: Unilin supplies its L2C labels to licensed manufacturers only, one label per box.

03

A price holds only for the quantity per decor it was worked out on; one of the 13 Vietnam factory profiles we publish states a standard MOQ.

A Vietnamese factory sends an FOB Hai Phong price for “5 mm SPC, 0.3 mm wear layer, IXPE”, and the quote does not say what the number covers. We do not publish prices. What follows is what an FOB number from a Vietnamese SPC plant pays for, where the factory has room to move, and which written terms change it.

What goes into an SPC FOB price from a Vietnamese factory?

Four blocks: the board as built, the packing, the factory’s costs between its gate and the ship’s rail, and the commercial terms the price was calculated on. Margin sits on top of all four. A quote that names every line in each block can be checked; a quote that gives one number per m² cannot.

The table splits the price into the lines we would expect a factory to be able to answer for. The split is our method, built from the construction of an SPC board and the seller’s duties under the ICC’s FOB rule.

Block Line What moves it What the quote should state
Board Core Board thickness, density, resin and filler mix Board thickness without pad, weight per m² with tolerance
Board Wear layer and coating Wear layer thickness, UV coating layers, special finishes Wear layer in mm, measured without print; coating named
Board Decor film Stock or custom design, embossing (EIR) Film reference, stock or exclusive, EIR yes or no
Board Pad Material, thickness, attached or loose IXPE or EVA, mm, attached
Board Click Profile, licensor, label Click system and licensor named
Packing Carton, pallet, labels Print, carton strength, pallet type, labels per box Pieces and m² per carton, carton print, pallet type
To on board Inland and port Truck to port, export clearance, origin port handling Port named, each charge stated as included or excluded
Terms Quantity, payment, currency, validity MOQ per decor, deposit and balance trigger, quote currency, expiry Each one written, with a date

Next step: put every factory's reply on the same written brief before comparing them.

Which board choices move the price most?

The core and the wear layer. The core is most of the board’s mass, so its thickness and density decide how much resin and stone powder the factory buys, and the wear layer’s thickness sets how much clear film goes on each m². The decor film, coating, pad and click profile follow, each a line a factory can change without changing the headline.

The mix ratio of resin and stone powder is the one line a buyer cannot see. Weight per m² at a stated thickness, with a tolerance in the contract, is the nearest proxy.

Vietnam imports PVC resin: UN Comtrade data show its 2023 imports came mainly from Taiwan, China, Indonesia, the United States and Japan, ranked by value. A plant buying imported resin carries a material cost set outside Vietnam, which is why some price-hold offers carry a resin condition.

On the wear layer, read the number and the method together. ASTM F3261-26, the US specification for rigid-core flooring, allows print or surface decoration that gives surface protection to count towards the total wear layer. Two quotes saying “0.3 mm” can therefore describe different clear films. Ask for the clear wear layer in mm, measured to a named method; our guide to checking an SPC wear layer covers the methods.

The decor film is a cost line that can change without the headline changing. A stock film from the factory’s book and an exclusive design printed for you are different costs; so are a flat surface and embossing in register.

The click licence is a cost the factory carries only if it is licensed for the profile it mills. A quote that says “click” without a system or licensor may describe an unlicensed profile, which costs the factory less to produce. Unilin’s label programme puts the licence on the box: flooring without its L2C label is treated as unlicensed even when a licensee made it. Unilin says the labels are provided at no additional cost to licensed manufacturers, so the label is the proof to ask for, not a line item.

A missing licence line can explain a low price on its own, and it changes who carries the legal risk at the border. Name the system and the licensor in your request and on the purchase order; how the licensors’ records work is in our guide to click licences for importers.

What does the factory pay for between its gate and the ship?

Everything until the goods are on board at the named port. Where the contract incorporates Incoterms 2020, FOB has the seller clear the goods for export where applicable, pays all costs relating to the goods until delivery on board the vessel the buyer nominated, and pays for the usual proof of delivery. The buyer contracts the ocean carriage.

Read against an SPC order, that puts these costs inside the FOB price: trucking from the plant to the port, export customs formalities, handling at the port of loading up to loading on the vessel, and the paper that proves delivery. The buyer’s side starts with the booking: ICC’s B4 has the buyer contract carriage from the named port, and B9 puts on the buyer the extra costs if its nominated vessel arrives late, does not take the goods or closes for cargo early.

The table sets out which party pays what under the ICC rule, and where quotes can disagree.

Cost Under FOB (Incoterms 2020) Where quotes differ Write in the quote
Truck from factory to port Seller, until on board Cost depends on distance to the port; some quote ex-works plus a trucking line Included, port named
Export clearance and its duties or fees Seller, where applicable (A7, A9) Seller’s under the rule; may be listed as “local charges” Included
Origin port and terminal handling Seller, until on board Easy to leave out or shift to the buyer’s forwarder Included or excluded, by name
Proof of delivery Seller (A9) Document named Bill of lading or receipt named
Ocean freight and booking Buyer (B4) A factory that offers to book may price it in Excluded, or quoted separately
Delay caused by the buyer’s vessel Buyer (B9) Storage at the port after the vessel slips Who pays, from which day

One point from the ICC’s own notes matters for containers. FOB is a rule for sea and inland waterway transport, and the ICC says it is not appropriate where the goods are handed to a carrier at a container terminal; there it points users to FCA. Containerised SPC is handed over at a terminal before it is loaded. If your contract says FOB, write which port and terminal charges are the factory’s, so the gap between handover and loading is not left to argument. What happens to the cost after the ship’s rail is the subject of our SPC landed cost calculation.

1 THE BOARD 2 PACKING 3 TO ON BOARD 4 THE OFFER core: resin and stone powder wear layer, UV coat decor film pad click and licence cartons, print pallets, corners labels per box your brand, if private label truck to port export clearance origin port and terminal handling loading on board margin quantity per decor payment terms currency validity date factory's costs and risk buyer from here goods on board: risk passes
Fig. 1How an FOB price builds up. Under Incoterms 2020 FOB the factory carries costs and risk until the goods are on board the buyer's vessel at the named port.

How do packing and quantity change the price?

Packing is priced per carton and per pallet, so carton count, print and pallet type all show up per m². Quantity enters through set-up: each decor, thickness or carton design changes the line set-up, so a price worked out for a full container of one decor will not hold for the same volume split across several.

Packing lines to fix in the request:

  • Carton. Pieces and m² per carton, board strength, print in how many colours, and whether your brand or the factory’s goes on it. A private-label carton means print plates and a minimum print run.
  • Pallet. Wooden, plywood or none. ISPM 15, the international standard for wood packaging, covers packaging made from raw wood, including dunnage, and excludes wood processed so that pests cannot survive in it, such as plywood. The choice changes both the pallet cost and the treatment required.
  • Labels and inserts. The licensor’s label per box where the click is licensed, barcode labels, installation leaflets in your languages.
  • Protection. Corner guards, film wrap, strapping. Ask for them by name; they are easy to drop when a factory needs to meet a price.

Carton weight and pallet type also change how many m² go into a container, and with it every per-m² cost after the factory gate; the container loading calculator works that out from the gross carton weight.

Quantity is the term a buyer most often assumes. The only one of Vietnam’s 13 serious SPC plants that publishes a standard MOQ describes it as generally one full container, which says nothing about the split across decors. Ask for the minimum per order, per decor and per carton design, and the price at each.

How do payment terms, currency and validity sit inside the price?

Every price is quoted against a payment term, a currency and an expiry date, whether the quote prints them or not. A factory that waits longer for its money, carries exchange risk or holds a price for months builds that into the number. The same board on different terms is a different offer.

Payment is the clearest case. A balance paid after an independent inspection, or a letter of credit with its bank charges and document rules, costs the factory more than cash before loading. If you ask for a later balance trigger, expect it to be priced, and decide whether it is worth it; our guide to deposit and payment safety covers the terms themselves.

Currency is the second. When a Vietnamese plant quotes in US dollars, its labour and local costs are still paid in dong. A quote in another currency, or with an exchange-rate clause, moves risk from one side to the other. Validity closes the set: ask for an expiry date on every quote, and for the conditions (resin, exchange rate) under which the factory may re-quote before it.

A worked example: one quote read against the four blocks

Illustrative only; no prices, no named factory. A UK distributor receives one reply from a northern Vietnamese plant: “5 mm SPC, 0.3 mm wear layer, IXPE, 1220 × 180 mm, FOB Hai Phong, one 20ft container”. Before discussing the number, he sends back the four blocks as questions.

The answers change what the price describes. The “5 mm” includes a 1 mm pad, so the board is 4 mm. No click system is named and no weight is given. Packing is “export standard”. “Local charges excluded” sits at the foot of the quote. The price assumes one decor per container; he needs four.

He rewrites the request: board 5 mm without pad plus 1 mm IXPE, weight per m² with tolerance, clear wear layer in mm by a named method, click system and licensor, plywood pallets with corner guards, every origin port charge included, four decors per container, valid for 30 days. The plant re-quotes. The new price describes a different and complete offer, and the decision is whether that offer is worth ordering a sample for.

Our view

An FOB price is a description of an offer, and the number is the last line of it. We would never discuss price with a Vietnamese SPC factory before the board, packing, port charges and terms are fixed in writing, because a factory asked to lower a price will find the line you did not fix.

We would also stop asking “what is the FOB price of SPC in Vietnam?” as a single question. No single number answers it. A price exists for a stated board, packed a stated way, delivered on board at a stated port on stated terms. Once those are written down, the number can be judged. Other guides on specifications and quotations are in our specs and quotes guides.

If you hold quotes from Vietnamese plants and cannot tell what explains the gap, send them to us: we read them against your specification and tell you what to ask next, as part of factory selection.

Common mistakes with SPC FOB quotes

Most surprises start with a quote accepted as a single number. The table lists the mistakes, what each costs the buyer and the request that prevents it.

Mistake What it costs How to avoid it
Negotiating the price before fixing the board The factory meets your number by changing core, wear layer or pad Fix construction and weight with tolerance first
Accepting “FOB” without port charges listed Origin charges reappear on your forwarder’s invoice Name each origin port charge as included or excluded
Ignoring the quantity basis The price rises when you split the order across decors Ask for the price at your real decor split
Leaving the click unnamed An unlicensed profile and a border risk you carry System and licensor named on the PO
Taking a quote with no expiry date The factory re-quotes when material or exchange rates move Expiry date and re-quote conditions written on the quote

Questions buyers ask

Will a Vietnamese factory split its FOB price into cost lines?

Some will separate the board, the pad and the packing; few will show margin. Where a factory will not split, ask for the price of each change instead: the same quote with a thicker wear layer, without the pad, with plywood pallets. The differences tell you most of what a split would.

What happens to the price if I change the carton or pallet after ordering?

Expect a revised price and possibly a revised lead time, because print plates, carton stock and pallet orders are often bought before production. Agree the change in a signed amendment that names the new packing and the price effect before the factory orders material.

Does an FOB price include a certificate of origin or other export papers?

Do not assume it. Papers your import side needs, such as a preferential certificate of origin or a fumigation certificate, are easiest to settle as named lines in the quote: included, or charged at cost. Ask for them at the quote stage, not at loading.

Can I ask the factory to hold its price for a repeat order?

You can ask for a price that holds for a stated period or a stated number of containers, tied to the same written specification. A factory may link it to a resin or exchange-rate condition. Read that condition closely; it decides when the price can move.

Can you tell me whether a Vietnamese FOB quote is fair?

We do not publish prices or benchmarks. We read the quotation against your specification and its terms, mark what is missing or not comparable, and say what to ask the factory next. Buyers send us the quotes they hold through the services page.

Sources & further reading

Authorship, affiliations & disclosure

Prepared from the ICC, ASTM, Unilin, IPPC and UN Comtrade sources listed, read on 11 November 2026, and from Vietnam factory documents reviewed in October and November 2026. We publish no prices; the worked example is illustrative. This is purchasing guidance, not legal advice.

Corrections & editorial information

Continue exploring.

All guides in Specs & quotes