Specs & quotes / Sunlit rooms
SPC flooring and sun exposure: gaps, glazing and fade evidence
SPC flooring in direct sunlight: one maker doubles its 5 mm gap to 10 mm where sun comes through glass doors. What to ask for before you approve a decor.
Short answer
Treat the strip of floor behind large glazing as its own zone. Take the gap and run-length rules from the installation guide you will ship with the goods, using its hot-room rule rather than the standard one. Ask the factory for a measured expansion coefficient and a light-fastness result on your decor, and match your own warranty to the factory’s sunlight exclusion before the decor is approved.
Quick-Step’s Alpha Vinyl instructions (version 09.2023) cut the largest room without an expansion profile from 13 m x 13 m at 15-35°C to 8 m x 8 m for rooms that range from 5 to 65°C.
ASTM F2199 and ISO 23999 measure the size change left after a plank is heated and brought back to room temperature; that datasheet line is not a coefficient of thermal expansion.
RW Supply+Design’s rigid core SPC warranty (valid April 2022) says it does not cover discolouration due to direct sunlight or extreme heat.
The installation rule for the strip of SPC behind a wall of glass, the evidence that the decor will hold its colour and the warranty wording all have to be settled before the decor is approved: none of them can be changed once the boards are in a container.
Why is the floor by the glass hotter than the room?
The thermostat measures air. Sunlight through glazing heats the plank surface directly, and a dark decor absorbs more of it than a pale one, so the floor in the sun runs hotter than the room around it. The installation guides we read set room ranges and heating limits; none gives a surface limit for sun.
What they do set is a separate rule for rooms like this. The table compares three makers’ written rules for their own rigid core products, quoted from their current documents. They are not interchangeable: each applies to the product it was written for.
| Maker and document | Standard perimeter gap | Rule for sun, heat or large rooms | What it says about sunlight |
|---|---|---|---|
| Karndean, rigid core guide, UK (April 2026) | Minimum 5 mm; 8 mm over 100 m² | Minimum 10 mm in sunrooms, conservatories and where there is direct sun through glass doors; 8 mm expansion joint where a run exceeds 15 m | Protect from heat and prolonged direct sunlight, which may damage the floor |
| Quick-Step, Alpha Vinyl (version 09.2023) | 8 mm | Largest room without a profile: 13 m x 13 m at 15-35°C, 8 m x 8 m at 5-65°C, 30 m x 30 m with HVAC at 18-25°C | Not for solariums or seasonal porches; glue-down vinyl advised for high local temperatures |
| RW Supply+Design, rigid core guide (January 2024) | 1/4 in up to 50 ft x 50 ft | 1/2 in up to 100 ft x 100 ft; any run over 50 ft needs a 1/2 in gap round each 50 ft section | Extended direct sun can fade or discolour; use UV tinting or window treatments |
| RW Supply+Design, SPC float quick-start guide (undated) | 1/2 in regardless of thickness | Add 1/16 in for every 3 ft beyond any 25 ft span | Not stated |
The last two rows come from the same company and do not agree on the base gap. That is the reason to work from the document that will go in your cartons, not from a figure seen elsewhere.
What does the dimensional stability figure on a datasheet measure?
It measures how much a plank has changed size after it is heated in a test and brought back to room temperature. ASTM ties that result to shrinkage from internal stress relief. It does not tell you how far the floor grows while it is hot, which is the movement an expansion gap has to absorb in a sunlit room.
ASTM F2199 covers the change in linear dimensions of tiles and planks after exposure to heat and reconditioning to ambient temperature, and measures curl after the same treatment. ISO 23999, now in its fourth edition (November 2025), covers dimensional stability and curl after heat exposure, after reconditioning, or both. Datasheets quote it as a single limit: Oneflor’s Rigid30 XL sheet (June 2019) lists ≤ 0,06 % and curl ≤ 2 mm; Aspecta’s RC30 rigid click sheet (October 2023) lists ≤ 0.25 % under the label “dimensional stability due to variation of temperature”. Neither sheet gives a coefficient of linear thermal expansion, and that label overstates what the test measures.
The reversible movement has its own methods. ISO 11359-2:2021 determines the coefficient of linear thermal expansion of solid plastics by thermomechanical analysis. ASTM D696 does the same with a dilatometer but only between -30°C and +30°C, below the temperature of a floor in summer sun, so a D696 figure needs the range read with it. Treat a missing coefficient as missing data rather than a pass. If the factory already runs heat stability on first boards, the request fits next to heat stability as a hold point on first production boards. Before you rely on any report, check that it covers the product you buy: core formulation, thickness and laboratory named.
How big should the expansion gap be next to large windows?
As big as the installation guide’s hot-room rule says, measured at the tightest point, and repeated around anything fixed. Karndean defines its minimum as the smallest gap measurable at any point round the perimeter. Quick-Step treats a kitchen island or built-in cabinet as a wall. A floor pinned by an island in the sunlit zone has less room to move than the plan suggests.
The rules that change near glazing are the gap, the run length before a profile and the boundaries with other rooms. Quick-Step makes a profile mandatory where adjacent rooms vary differently above and below its 18-30°C range, which describes a glazed extension opening into a heated kitchen. Karndean’s 15 m joint rule and Quick-Step’s room sizes both limit length and width, so a long glazed wall usually sets the layout.
Two rules sit outside the gap. Karndean does not usually permit adhering its rigid core to the substrate, because that stops the floor moving. Quick-Step, for critical situations with high local temperatures, recommends its glue-down range instead. If the project’s window zone cannot meet the floating rules, the question is whether the project should be glued down at all, and that is a product decision, not a gap size.
Will the decor fade, and what proves it?
A light-fastness result on the decor and finish you are buying proves it, nothing less. European datasheets quote ISO 105-B02 as a grade; American ones may quote ASTM F1515 as a colour difference. Both are accelerated laboratory exposures. Neither heats the plank the way glazing does, so they answer the colour question only.
ISO 105-B02 is a textile method: a xenon arc lamp representing daylight, with the result graded against blue wool references. ISO allows two sets of references and notes that they may not give identical results, so the report should state which set was used. The 2014 edition was confirmed in 2025 and, as of November 2026, is listed for revision. The datasheets we read quote grade 6 or better, one of them naming method 3. ASTM F1515 measures colour change of resilient flooring as ΔE* before and after accelerated light exposure, and calls light stability a basic requirement for functional use.
The table sets out what to request and the limit of each piece of evidence.
| Evidence | What the report should show | What it does not tell you |
|---|---|---|
| Light fastness, ISO 105-B02 | Grade, method, which blue wool references, decor and finish code tested | How the floor behaves when hot |
| Light stability, ASTM F1515 | ΔE* after a stated exposure, decor and finish code tested | A pass mark, unless your specification sets one |
| Dimensional stability and curl, ISO 23999 or ASTM F2199 | Edition, test temperature, change in % and curl in mm, on your core | Reversible growth in sun |
| Linear thermal expansion, ISO 11359-2 or ASTM D696 | Coefficient, temperature range, specimens from production core | Colour change |
A light-fastness grade belongs to a decor printed on a film and protected by a given wear layer and finish. If the decor film route changes, or the finish does, the old report describes another product.
What do warranties say about sunlight and heat?
The ones we read all exclude it in some form, and the wording decides whether a faded or gapped window strip is your cost or the factory’s. Read the exclusions in the warranty you will issue to your own customers and in the one the factory gives you, side by side, before the order is placed.
The wording varies widely. RW Supply+Design’s rigid core SPC warranty (valid April 2022) does not cover “discoloration due to direct sunlight or extreme heat”, lists changes in colour due to sunlight and age, and excludes separation and damage caused by excessive heat. The RigidCORE HD 35-year residential warranty (revised October 2021) promises that the wear layer will not fade because of direct sunlight, then excludes floor areas in direct sunlight for much of the day, such as sunrooms, that are not glued down, and damage from heat above 35°C.
If the factory warranty excludes sun and yours does not, the gap between them is yours to pay. That is one of the grounds covered in what a factory warranty usually leaves out, and the wording has to be settled where the quotation leaves it open; see what a factory quotation does not commit.
What should the sign-off sheet say for floors behind glazing?
One block, signed with the decor approval, that names the evidence and the installation rule for sunlit rooms. Without it, the decor is approved on colour alone and the sunlight question comes back as a claim. The table is our method; the right column is what the factory confirms in writing.
| Line on the approval sheet | Filled in from | Confirmed by the factory |
|---|---|---|
| Window zone use | Your market: conservatories, glazed extensions, south-facing glazing | Accepted, or excluded in writing |
| Installation guide and version shipped in the carton | Factory or brand owner | Hot-room gap, run limit before a profile, room temperature range |
| Light-fastness result for this decor and finish | Lab report | Method, grade or ΔE*, references used |
| Dimensional stability and curl | Lab report on production core | ISO 23999 edition, result |
| Linear thermal expansion | Lab report on production core | Coefficient and temperature range, or “not tested” |
| Warranty wording on sunlight and heat | Factory warranty and yours | Same exclusions, or the difference priced |
Put the same lines into the quote brief so that every factory answers them, and the comparison includes evidence as well as price.
How does this work on one order? A worked example
Illustrative only. A UK distributor adds a dark smoked oak decor to its SPC range, aimed at glazed rear extensions. A typical project has an 11 m run along bifold doors, open to a heated kitchen with an island. The factory’s guide asks for a standard gap and gives a hot-room rule; its datasheet lists ISO 23999 and an ISO 105-B02 grade and no expansion coefficient.
The distributor asks for a coefficient to ISO 11359-2 on production core. For the arithmetic, take 0.05 mm per metre per °C, an illustrative figure and not a measured value. If the whole 11 m run warmed by 25°C above the temperature it was laid at, it would grow by 11 x 0.05 x 25 = 13.75 mm, or about 7 mm at each end if it moved evenly. A 5 mm standard gap would not hold it; a 10 mm hot-room gap would, provided the island has its own gap and nothing pins the floor.
The distributor approves the decor with the window zone block filled in: the factory’s hot-room gap printed in the carton guide, a profile at the kitchen boundary, the light-fastness report on the dark decor itself rather than a paler one from the same range, and its own warranty’s sunlight clause matched to the factory’s. It costs one lab test and a page of the specification.
Our view
We would decide the window zone at decor approval, not at installation, and make the factory confirm in writing the hot-room rule in the guide that ships in the carton. Without it, the installer will use whichever figure is to hand.
We would ask for a measured expansion coefficient on production core for any decor sold into glazed rooms, and a light-fastness result on each dark decor, not one result for the range. Our product development work covers writing these lines into a specification and checking the reports against it; for the rest of the specification process, see the specs and quotes guides.
Common mistakes with SPC in sunlit rooms
Most sunlit-room failures we would guard against start as a missing line on the approval sheet. The table lists them with what each costs and how to avoid it.
| Mistake | What it costs | How to avoid it |
|---|---|---|
| Using the standard gap next to large glazing | Damage that Karndean’s guide links to incorrect gaps | Follow the maker’s hot-room rule, measured at the tightest point |
| Reading the ISO 23999 line as thermal expansion | No real data on movement in sun | Ask for ISO 11359-2 on production core |
| One light-fastness report for a whole range | The dark decor fades outside the evidence | Report per decor and finish |
| Fixing an island on top of the floor | The floor is pinned in the hottest zone | Fit fixed objects first, gap all round |
| A warranty wider than the factory’s | You pay for sun damage the factory excludes | Match the sunlight and heat clauses before ordering |
| Filling the gap with silicone at the glazing | The floor cannot move | Cover gaps with a profile or trim |
Questions buyers ask
Can I ask the factory to test the expansion coefficient on our production core?
Yes. Name the method (ISO 11359-2, or ASTM D696 if you accept its -30 to +30°C range), the temperature range, and that the specimens come from your production boards. Agree who pays and who owns the report before production starts.
What happens if the floor is laid on a cold day and the sun comes out in June?
It starts small and grows. Quick-Step warns that the risk of excessive expansion increases as the installation temperature falls, which is why guides set an installation range and an acclimatisation period. A floor laid at the low end of the range needs every millimetre of its gap.
Does a UV-protective lacquer stop fading?
It may slow it, but the evidence is a test result, not the name of the coating. Ask for the light-fastness report on the decor and finish you are buying, and treat a change of either as a new product for testing purposes.
Can the end customer cover the expansion gap with silicone along the glazing?
Not as a gap filler. Karndean allows a flexible sealant only to protect gaps at fixed furniture in potential wet areas and says sealant should not be used for the general filling of expansion gaps. A filled gap no longer allows the movement it was left for.
Sources & further reading
- Karndean Designflooring: Rigid Core plank and tile installation guidelines, UK (KD9430GLO, April 2026)
- Quick-Step: what is the maximum floor length I can install? Alpha Vinyl (read November 2026)
- RW Supply+Design: Rigid Core SPC lifetime / 10 year warranty (valid as of April 2022)
- ASTM F2199-20: Dimensional stability and curling of resilient flooring after exposure to heat, scope and significance (read November 2026)
- ISO 105-B02:2014: Colour fastness to artificial light, xenon arc fading lamp test, abstract (read November 2026)
Authorship, affiliations & disclosure
Prepared from manufacturers’ installation guides, datasheets and warranties and from the standards bodies’ published scopes, read on 11 November 2026. The full standards are sold documents and were not read; nothing here restates a requirement beyond the published scope. Makers’ rules are quoted for their own products and are not general limits. The worked example and its expansion coefficient are illustrative, not measured values.
Corrections & editorial informationContinue exploring.
All guides in Specs & quotesSPC flooring gloss level: how to specify a matt finish that repeats
Name the geometry, target and tolerance: ISO 2813 reads gloss at 20°, 60° or 85°, and its scope covers non-textured coatings only.
Read the guideAcoustic SPC flooring: how to specify and verify the sound rating
Acoustic SPC flooring claims rest on one lab build-up: ASTM E2179 rates the covering on a concrete slab, not your building. What to ask for.
Read the guideSPC flooring quotation: what the factory has not committed to
An SPC quotation fixes goods, quantity and price. Decor stock, shade, packing and lead-time start need clauses; CISG article 35 fills the rest.
Read the guide